盔甲
过程(计算)
极限抗拉强度
材料科学
结构工程
复合材料
工程类
法律工程学
计算机科学
操作系统
图层(电子)
作者
Qingzhen Lu,Shanghua Wu,Ben Zhong Tang,Zhixun Yang,Yin Yuanchao,Haitao Hu,Jun Yan,Qianjin Yue
出处
期刊:ASME 2019 38th International Conference on Ocean, Offshore and Arctic Engineering
日期:2019-11-11
标识
DOI:10.1115/omae2019-95426
摘要
Abstract In this paper, a mechanical model of armor wire winding process is established to quantify the relationship between the tension force and the internal force of armor wire cross section in winding process. Then based on this model, a method for predicting the residual stress of armor wire cross section after winding is presented. The reasonable winding tension force and the minimum residual stress are discussed. In addition, the reasonable design of the processing equipment is further discussed. This paper provides a useful reference for the evaluation of key parameters and the prediction of residual stress in the processing of tensile armor layer of offshore flexible pipes and cables.
科研通智能强力驱动
Strongly Powered by AbleSci AI