液化天然气
火用
基本负荷发电厂
天然气
环境科学
工艺工程
工厂效率
发电站
工程类
工作(物理)
废物管理
可再生能源
机械工程
电气工程
分布式发电
作者
Hajer Mkacher,Fares Almomani,Ajinkya Pal,Iftekhar A. Karimi,Easa I. Al‐musleh
摘要
The use of liquefied natural gas (LNG) has grown over the last decade owing to an increase in the global energy demand. This work presents a pioneering approach for rigorous simulation of an actual cold section of an LNG plant and provides a potential process optimization to achieve a higher production rate (PR) while reducing the specific power consumption (SPC). The concept of upfront nitrogen removal (UNrem) from the natural gas (NG) feed was introduced, and the impact on the PR and SPC was presented. We considered seven scenarios with varying percentages of UNrem and compared them with the conventional plant design (base case) while maintaining the product specifications (LNG high heating value [HHV] of 1105 Btu/Scf and NGL reid vapor pressure [RVP] of 2042 psia). The results show that UNrem of 87.5% from the NG feed can reduce the total power requirements by 0.24%, increase the production flow rate by 4.4%, and decrease the exergy losses by 0.23% compared with the base case. The UNrem can also have a significant improvement on the plant capacity without the need for structural modifications in the cold section. Future research should focus on the efficiency and feasibility of different UNrem processes as well as examine the use of a large-scale system.
科研通智能强力驱动
Strongly Powered by AbleSci AI