备品备件
调度(生产过程)
初始化
运筹学
工程类
生产(经济)
服务(商务)
计算机科学
可靠性工程
运营管理
业务
宏观经济学
经济
营销
程序设计语言
作者
Bingxin Miao,Qianwang Deng,Like Zhang,Zhangwen Huo,Xiaoyan Liu
标识
DOI:10.1016/j.jmsy.2022.06.012
摘要
We analyse the joint scheduling of spare parts production and service workers driven by distributed maintenance demand. For each failure, a service worker and a necessary spare part must be assigned for on-site maintenance. In particular, the spare part is not supplied from stock, but is delivered directly from the factory to the maintenance site through just-in-time production. Spare parts production and worker allocation are integrated to optimize two objectives: customer satisfaction and total service cost. To solve the problem, we first construct a mathematical model. Subsequently, a modified non-dominated neighbor immune algorithm (MNNIA) is proposed, in which a knowledge-based initialization rule, an idle time insertion method, and two problem-specific local search operators are developed to enhance exploitation. Extensive experiments and comparisons are conducted to demonstrate the superiority of MNNIA. Furthermore, compared with that of the separate decision-making mode of spare parts production and worker arrangement, the effectiveness of the integrated scheduling mode is verified.
科研通智能强力驱动
Strongly Powered by AbleSci AI