灵活性(工程)
供应商关系管理
采购
业务
供应链
生产(经济)
运营管理
过程管理
供应链管理
产业组织
制造工程
知识管理
营销
计算机科学
工程类
经济
微观经济学
管理
作者
Mohammed Ali Suleiman,Baofeng Huo,Yuxiao Ye
出处
期刊:Industrial Management and Data Systems
[Emerald (MCB UP)]
日期:2021-07-22
卷期号:121 (11): 2237-2253
被引量:3
标识
DOI:10.1108/imds-02-2021-0096
摘要
Purpose Implementing just-in-time (JIT) practices on the supplier side is a common practice to streamline procurement and production planning in realization of cost efficiency and lead time reduction. However, it is little known how supplier JIT is related to firm flexibility performance and what factors may facilitate the relationship. This study aims to investigate the effects of supplier JIT on flexibility performance and explore the moderating impacts of advanced manufacturing technology (AMT) and human resource empowerment (EMP). Design/methodology/approach This study applies hierarchical linear regression analysis to test the proposed model based on data collected from 213 manufacturing firms in China. Findings The results revealed a negative influence of supplier JIT on flexibility performance. However, the adoption of AMT and EMP reconciles the conflict between supplier JIT and flexibility performance. Besides, the results indicate the positive effects of AMT and EMP on flexibility performance. Originality/value This study contributes to supply chain JIT literature by providing a holistic view to understand the structural relationships between supplier JIT, AMT, EMP and flexibility performance.
科研通智能强力驱动
Strongly Powered by AbleSci AI