Research on the Mechanism and Evolution Law of Delayed Water Inrush Caused by Fault Activation with Mining

励磁涌流 地质学 断层(地质) 蠕动 煤矿开采 采矿工程 应力场 岩土工程 地震学 材料科学 工程类 结构工程 电压 有限元法 废物管理 电气工程 复合材料 变压器
作者
Guangli Zhu,Shuli Wang,Wenquan Zhang,Baoyu Li
出处
期刊:Water [MDPI AG]
卷期号:15 (24): 4209-4209 被引量:1
标识
DOI:10.3390/w15244209
摘要

Confined water inrush caused by fault activation is the main form of water disaster in deep mining. With theoretical analysis and similar simulation tests, the mechanism and evolution law of delayed water inrush caused by fault activation are revealed. At the theoretical level, the expansion and extension of the internal microstructure in the fault zone under the action of the mining stress field and seepage field are the essential causes of fault activation. Overlying strata movement and surrounding rock creep failure are the basic reasons for delayed water inrush caused by fault activation, and delayed time caused by surrounding rock creep failure is much longer than that of overlying strata movement. A similar simulation test was carried out with self-development solid–liquid coupling with similar simulation materials; the results show that delayed water inrush caused by fault activation with mining includes three stages. Micro-activation stage: Water inrush weakness point is formed because of the expansion and extension of the micro-fissure and structure at the bottom of the fault zone. Macro-activation stage: With the change in the stress of the waterproof coal pillar and surrounding rock, the micro-fissures and structures in the stress relief area and tension area of the fault zone expand and extend sharply; meanwhile, water intrudes into the interlayer stratification of the floor in the stress relief area, forming a strong laminar flow phenomenon, and cracks in the floor form and expand; finally, water-conducting channels in the fault zone and floor are formed. Water inrush stage: The waterproof coal pillar and water-resisting layer fail and are destroyed, and the first confined water inrush point is located at the junction of the waterproof coal pillar and gob floor.
最长约 10秒,即可获得该文献文件

科研通智能强力驱动
Strongly Powered by AbleSci AI
更新
大幅提高文件上传限制,最高150M (2024-4-1)

科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
王水水完成签到,获得积分10
刚刚
bkagyin应助陆未离采纳,获得10
1秒前
笨本呦完成签到 ,获得积分10
1秒前
2秒前
夏侯无色完成签到,获得积分10
2秒前
丘比特应助乔巴采纳,获得10
2秒前
3秒前
吕帅锜发布了新的文献求助10
3秒前
4秒前
hlmzyq发布了新的文献求助20
4秒前
4秒前
4秒前
烟酒牲完成签到,获得积分10
6秒前
6秒前
6秒前
在水一方应助eee采纳,获得10
7秒前
希望天下0贩的0应助sheep采纳,获得10
7秒前
李钟硕完成签到,获得积分10
7秒前
田様应助安静采纳,获得10
7秒前
Orange应助火星上的糖豆采纳,获得10
8秒前
甜兰儿发布了新的文献求助10
8秒前
小二郎应助stargazer采纳,获得10
8秒前
李爱国应助酷酷珠采纳,获得10
8秒前
9秒前
仓鼠侠完成签到 ,获得积分10
10秒前
威武鸵鸟完成签到,获得积分10
10秒前
努力摆烂发布了新的文献求助10
10秒前
11秒前
11秒前
ding应助Aki采纳,获得10
11秒前
12秒前
葡小小发布了新的文献求助10
12秒前
12秒前
腿腿完成签到,获得积分20
12秒前
大模型应助sakuraroad采纳,获得10
13秒前
yuyu发布了新的文献求助10
13秒前
Owen应助ymbb采纳,获得10
14秒前
希望天下0贩的0应助hashtag采纳,获得10
14秒前
14秒前
科研通AI2S应助xiaoKai采纳,获得10
14秒前
高分求助中
Sustainability in Tides Chemistry 2000
Bayesian Models of Cognition:Reverse Engineering the Mind 800
Essentials of thematic analysis 700
A Dissection Guide & Atlas to the Rabbit 600
Very-high-order BVD Schemes Using β-variable THINC Method 568
Внешняя политика КНР: о сущности внешнеполитического курса современного китайского руководства 500
Revolution und Konterrevolution in China [by A. Losowsky] 500
热门求助领域 (近24小时)
化学 医学 生物 材料科学 工程类 有机化学 生物化学 物理 内科学 纳米技术 计算机科学 化学工程 复合材料 基因 遗传学 催化作用 物理化学 免疫学 量子力学 细胞生物学
热门帖子
关注 科研通微信公众号,转发送积分 3124076
求助须知:如何正确求助?哪些是违规求助? 2774440
关于积分的说明 7722701
捐赠科研通 2430008
什么是DOI,文献DOI怎么找? 1290873
科研通“疑难数据库(出版商)”最低求助积分说明 621960
版权声明 600283