尺寸
计算机科学
蒙特卡罗方法
最大熵原理
脆性
缓冲器(光纤)
脆弱性
数学优化
可靠性工程
工程类
数学
材料科学
统计
艺术
物理化学
视觉艺术
人工智能
复合材料
化学
电信
作者
Junlong Peng,Chao Peng
出处
期刊:Buildings
[MDPI AG]
日期:2022-09-05
卷期号:12 (9): 1390-1390
被引量:3
标识
DOI:10.3390/buildings12091390
摘要
In order to solve the problems such as project duration delay caused by unreasonable buffer zone setting, a critical chain buffer zone setting method is proposed based on fragility theory. Firstly, we propose that the construction process is brittle and the brittleness of the construction process was analyzed. Secondly, this paper introduces a risk-integrated impact rate to describe the uncertainty of the construction process and establishes a brittle risk entropy function. Then, it presents entropy models and modification models of project buffers and feeding buffers based on the original Root Square Error Method. Finally, an engineering project was selected as an example, and the simulation was carried out using the Monte Carlo simulation software Crystal Ball, and the resulting method was compared with three buffer zone calculation methods. The results show that the method can effectively reduce the construction period and is effective and practical when compared to the other three buffer calculation methods. The results of the study provide a new way of thinking about buffer settings based on existing critical chain project management methods.
科研通智能强力驱动
Strongly Powered by AbleSci AI