海上风力发电
可靠性(半导体)
控制重构
可靠性工程
断层(地质)
海底管道
风力发电
工程类
海洋工程
维修工程
电气工程
计算机科学
功率(物理)
嵌入式系统
地质学
岩土工程
物理
量子力学
地震学
作者
Xiaochi Ding,Yunfei Du,Xinwei Shen,Qiuwei Wu,Xuan Zhang,Nikos Hatziargyriou
标识
DOI:10.1109/tste.2024.3462476
摘要
The electrical collector system (ECS) plays a crucial role in determining the performance of offshore wind farms (OWFs). Existing research has predominantly restricted ECS cable layouts to conventional radial or ring structures and employed graph theory heuristics for solutions. However, both economic efficiency and reliability of the OWFs heavily depend on their ECS structure, and the optimal ECS cable layout often deviates from typical configurations. In this context, this paper introduces a novel reliability-based ECS cable layout planning method for large-scale OWFs, employing a two-stage stochastic programming approach to address uncertainties of wind power and contingencies. To enhance reliability, the model incorporates optimal post-fault network reconfiguration strategies by adjusting wind turbine power supply paths through link cables. To tackle computation challenges arising from numerous contingency scenarios, a customized progressive contingency incorporation (CPCI) framework is developed to solve the model with higher efficiency by iteratively identifying non-trivial scenarios and solving the simplified problems. The convergence and optimality are theoretically proven. Numerical tests on several real-world OWFs validate the necessity of fully optimizing ECS structures and demonstrate the efficiency of the CPCI algorithm.
科研通智能强力驱动
Strongly Powered by AbleSci AI