开发(拓扑)
计算机科学
遗传算法
算法
数学
机器学习
数学分析
标识
DOI:10.1142/s0218126622502723
摘要
This paper systematically constructs a multi-project and a multi-objective human resource scheduling mathematical model in construction projects and puts forward an improved genetic algorithm to solve it by aiming at the problems existing in the process of human resource scheduling and optimization. Specifically, first, the basic mathematical models of GPRs and resource-constrained construction project human resource scheduling problem (RCWSP/GPRs) are established, and the multi-project equilibrium problem is extended. Then, an improved inter-cluster separation (ICS) algorithm is proposed and used to solve the RCWSP/GPRs problem. Finally, on this basis, the mathematical model of multi-project and multi-objective human resource scheduling problem and the solution method based on multi-objective-integrated circuit are proposed. At the same time, the resource-constrained multi-project and multi-skill human resource scheduling problem and the integer programming mathematical model under the generalized priority relationship are proposed. Also, the simulation results verify the accuracy of the proposed algorithm and model.
科研通智能强力驱动
Strongly Powered by AbleSci AI