The Optimization of Personnel Localization Management on international construction projects: cases study from China enterprises

工资 业务 中国 运营管理 工程类 经济 政治学 法学 市场经济
作者
Yi Wang,Xiaopeng Deng,Hongtao Mao
出处
期刊:Engineering, Construction and Architectural Management [Emerald Publishing Limited]
卷期号:30 (8): 3259-3291 被引量:4
标识
DOI:10.1108/ecam-10-2021-0957
摘要

Purpose This paper aims to explore the key risk factors affecting the Personnel Localization Management of international construction projects under the major public emergencies represented by the novel coronavirus pneumonia pandemic (hereinafter COVID-19) and how the public emergency affected the Personnel Localization Management from three levels: staff turnover rate, the number of different personnel, the salary and performance of workers. The paper also helps to enhance the construction enterprises' response capacity of major public emergencies and provides a comprehensive framework of optimization strategies for the Personnel Localization Management of international construction projects (hereinafter projects). Design/methodology/approach The main research method of this paper is the case study, and ten representative international construction projects are selected for case study in China construction enterprises (hereinafter CCE). And this study used the failure mode and effects analysis (FMEA) and comparative analysis to find out all potential risk factors under the COVID-19 and analyze how the epidemic affects the Personnel Localization Management of projects which based on the primary data from 10 projects obtained through in-depth interviews and the secondary data from China First Metallurgical Group and Central South Construction Group's Overseas Enterprise. Findings The findings show that the outbreak of the major public emergencies not only greatly increased eight risk factors but also directly led to an increase in staff turnover rate. Meanwhile, the numbers of Chinese and local managers and workers are all affected, and an increase in the number and the salary performance of local workers can be reduced, to a certain extent, to the cost-to-output ratio of the projects. The findings would help construction enterprises better cope with Personnel Localization Management and enhance the response capacity of major public emergencies. Research limitations/implications This study will broaden researchers' horizons regarding “Personnel Localization Management under major public emergencies” and “risk factors of Personnel Localization Management in an international context.” Furthermore, construction enterprises looking for a better mechanism of Personnel Localization Management can benefit from research findings and lessons learned from the authors' case study during or before an outbreak of major public emergency. Lastly, the framework of optimization strategies for Personnel Localization Management can be used both for research purposes and practice issues in international construction projects. Practical implications The findings from the authors' case study offer the direction for international construction enterprises in China and other countries to formulate effective measures, strengthen overseas business and establish a crisis management mechanism for Personnel Localization Management under major public emergencies, and the findings provide emergency plans for projects to improve the public crisis handling capacity and respond to major public emergencies such as the COVID-19. Social implications This study analyzes the impact of the COVID-19 on the Personnel Localization Management of international construction projects from the perspective of personnel. This study provides a theoretical reference for the international construction industry to actively respond to major public emergencies. Besides, the research is conducive to improving the emergency response mechanism in the construction industry, and further promoting the high-quality and globalized development of international construction. Originality/value This study provides other researchers with a comprehensive understanding of the risk factors affecting the Personnel Localization Management of projects under the COVID-19 and insight for further research on localization management, risk management, and project management.

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
1秒前
猪猪hero发布了新的文献求助10
1秒前
2秒前
一颗蓝莓完成签到 ,获得积分10
3秒前
3秒前
江蹇发布了新的文献求助10
3秒前
黑眼豆豆完成签到,获得积分10
4秒前
开放的凡梦完成签到,获得积分10
4秒前
可爱的函函应助慢慢人采纳,获得30
5秒前
不鸽应助撸撸大仙采纳,获得10
6秒前
6秒前
不懈奋进应助撸撸大仙采纳,获得30
6秒前
科研通AI6.2应助撸撸大仙采纳,获得10
6秒前
不鸽应助撸撸大仙采纳,获得10
6秒前
酷波er应助奶油猫猫采纳,获得10
6秒前
7秒前
果果发布了新的文献求助10
7秒前
垫垫给垫垫的求助进行了留言
7秒前
7秒前
湉湉完成签到,获得积分10
8秒前
温迪发布了新的文献求助10
8秒前
8秒前
8秒前
9秒前
在水一方应助ze采纳,获得10
10秒前
草包Doct完成签到,获得积分10
10秒前
CipherSage应助旺仔牛奶采纳,获得10
10秒前
一介书生发布了新的文献求助10
10秒前
爆米花应助wendy_zhang采纳,获得100
10秒前
万能图书馆应助蚂蚁牙黑采纳,获得10
10秒前
11秒前
大椒完成签到 ,获得积分10
11秒前
野风车发布了新的文献求助10
12秒前
hanhan发布了新的文献求助10
12秒前
yyy应助谨慎雁菱采纳,获得10
12秒前
大灰狼完成签到 ,获得积分10
12秒前
光亮寄凡发布了新的文献求助30
13秒前
Q啵关注了科研通微信公众号
13秒前
14秒前
栖息应助爱听歌笑寒采纳,获得10
14秒前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
Kinesiophobia : a new view of chronic pain behavior 3000
Les Mantodea de guyane 2500
Molecular Biology of Cancer: Mechanisms, Targets, and Therapeutics 2000
Standard: In-Space Storable Fluid Transfer for Prepared Spacecraft (AIAA S-157-2024) 1000
Signals, Systems, and Signal Processing 510
Discrete-Time Signals and Systems 510
热门求助领域 (近24小时)
化学 材料科学 生物 医学 工程类 计算机科学 有机化学 物理 生物化学 纳米技术 复合材料 内科学 化学工程 人工智能 催化作用 遗传学 数学 基因 量子力学 物理化学
热门帖子
关注 科研通微信公众号,转发送积分 5948968
求助须知:如何正确求助?哪些是违规求助? 7119799
关于积分的说明 15914362
捐赠科研通 5082096
什么是DOI,文献DOI怎么找? 2732368
邀请新用户注册赠送积分活动 1692792
关于科研通互助平台的介绍 1615538