制冷
空调
冷负荷
滞后
中央空调
工程类
模拟
计算机科学
机械工程
计算机网络
作者
Xue Zhu,Bo Dong,Yongjun Zhu
出处
期刊:Applied Mechanics and Materials
[Trans Tech Publications, Ltd.]
日期:2012-11-01
卷期号:220-223: 622-625
被引量:1
标识
DOI:10.4028/www.scientific.net/amm.220-223.622
摘要
With the characteristics of non-stationarity, non-linearity, time-lag of refrigeration/ heating supplying in minds, load forecasting of central air-conditioning system is carried using time sequence analysis method. Firstly, acquisition sample data of central air-conditioning system is pretreated, and random time sequence AR model of system is formulated. Then, forecasting of AR refrigeration/heating load based on Yule-walker method is conducted. In order to enhance forecasting accuracy, crossover forecasting is introduced into the load forecasting, that is, to use vertical forecasting to follow household demands for load and horizontal forecasting to track changes of weather. Then, weight cross is made to vertical and horizontal forecasting results. Finally, refrigeration/heating load forecasting software of central air-conditioning system is developed, which is used in energy-saving monitoring and control of central air-conditioning system.
科研通智能强力驱动
Strongly Powered by AbleSci AI