地铁列车时刻表
基于案例的推理
重新使用
施工管理
杠杆(统计)
计算机科学
项目管理
综合项目交付
运筹学
建筑工程
工程类
风险分析(工程)
系统工程
人工智能
土木工程
医学
操作系统
废物管理
作者
Linlin Xie,Sisi Wu,Yajiao Chen,Ruidong Chang,Xiaoyan Chen
标识
DOI:10.1016/j.autcon.2023.105028
摘要
The project schedule delay problem has received considerable attention for its significance in impeding project performance. Compared to conventional projects, prefabricated construction projects could suffer more from schedule delay problems. A possible solution to such problems is to provide countermeasures by referring to valuable experience of historical cases. This paper proposes a case-based reasoning (CBR) model to leverage past experience and knowledge to address the schedule delay problems in prefabricated construction projects. The study explains the development processes of the CBR model in detail, including the case base construction, case retrieval, case reuse and update. Subsequently, the study develops the CBR system and presents a case study to demonstrate the validity and practicality of the proposed approach. This study provides a potential tool to facilitate schedule management of prefabricated construction projects. It offers an effective reference for decision-makers, such as project managers, to tackle schedule delays through experience mining.
科研通智能强力驱动
Strongly Powered by AbleSci AI