作业车间调度
数学优化
计算机科学
初始化
调度(生产过程)
能源消耗
整数规划
启发式
地铁列车时刻表
数学
工程类
操作系统
电气工程
程序设计语言
作者
Hongliang Zhang,Gongjie Xu,Ruilin Pan,Haijiang Ge
标识
DOI:10.1080/0305215x.2021.1949007
摘要
With the increasing attention on environmental issues, green scheduling in manufacturing industries has become a hot research topic. As a typical scheduling problem, the flexible job-shop scheduling problem (FJSP) has received increasing attention, but research on the FJSP considering set-up and transportation times simultaneously is still rare. To address the energy-efficient FJSP with sequence-dependent set-up and transportation times to minimize makespan and total energy consumption, a multi-objective mixed-integer linear programming model of the problem is formulated and an effective novel heuristic method (NHM) is proposed. To enhance the convergence and distribution of the NHM, three strategies—population initialization, greedy iterative decoding and local intensification—are designed. The performance of the NHM is demonstrated by comparison with three algorithms through 48 instances. The results show that the NHM can obtain a scheduling scheme with lower makespan and total energy consumption than those of the comparison algorithms.
科研通智能强力驱动
Strongly Powered by AbleSci AI