Kefei Liu,Zhibin Jiang,Zhou Li-ping
标识
DOI:10.1080/24725854.2023.2272261
摘要
Motivated by make-to-order applications with committed delivery dates in a variety of industries, we investigate the integrated multi-plant collaborative production, inventory, and hub–spoke delivery problem in a complex production–distribution network. This network includes multi-location heterogeneous plants, distribution centers, and customers, for producing customized and splittable orders with one or more general-size multi-type jobs. Completed jobs are transported from plants to distribution centers, and then the orders whose all constituent jobs have arrived are delivered from distribution centers to customer sites. The objective is to make integrated scheduling decisions for production, inventory, and delivery, for minimizing total cost composed of production, transportation, tardiness, and inventory. We first formulate this problem as a mixed-integer programming model, and analyze its intractability by proving that the problem is NP-hard and no approximation algorithms exist with a constant worst-case ratio. We then reformulate this problem as a binary integer linear programming model to select a feasible schedule for each job, and propose a combined column generation and two-layer column enumeration algorithm to solve it. Through extensive numerical experiments, we demonstrate that our proposed algorithm is capable of generating optimal or near-optimal solutions expeditiously and outperforms four benchmark approaches, and gain valuable managerial insights for practitioners.
科研通智能强力驱动
Strongly Powered by AbleSci AI