管道运输
按来源划分的电力成本
管道(软件)
资本成本
尺寸
过程(计算)
工程类
计算机科学
模拟
发电
环境工程
功率(物理)
机械工程
量子力学
操作系统
电气工程
物理
艺术
视觉艺术
作者
Xiaobo Luo,Meihong Wang,Eni Oko,Chima Okezue
标识
DOI:10.1016/j.apenergy.2014.07.063
摘要
For large volumes of carbon dioxide (CO2) onshore and offshore transportation, pipeline is considered the preferred method. This paper presents a study of the pipeline network planned in the Humber region of the UK. Steady state process simulation models of the CO2 transport pipeline network were developed using Aspen HYSYS®. The simulation models were integrated with Aspen Process Economic Analyser® (APEA). In this study, techno-economic evaluations for different options were conducted for the CO2 compression train and the trunk pipelines respectively. The evaluation results were compared with other published cost models. Optimal options of compression train and trunk pipelines were applied to form an optimal case. The overall cost of CO2 transport pipeline network was analyzed and compared between the base case and the optimal case. The results show the optimal case has an annual saving of 22.7 M€. For the optimal case, levelized energy and utilities cost is 7.62 €/t-CO2, levelized capital cost of trunk pipeline is about 8.11 €/t-CO2 and levelized capital cost of collecting system is 2.62 €/t- CO2. The overall levelized cost of the optimal case was also compared to the result of another project to gain more insights for CO2 pipeline network design.
科研通智能强力驱动
Strongly Powered by AbleSci AI