前因(行为心理学)
背景(考古学)
知识管理
组织结构
工程类
业务
计算机科学
过程管理
建筑工程
系统工程
建筑工程
心理学
政治学
地理
社会心理学
考古
法学
作者
Qian Hu,Yonghong Chen,Liang Gao,Chenyongjun Ding
出处
期刊:Buildings
[Multidisciplinary Digital Publishing Institute]
日期:2024-10-30
卷期号:14 (11): 3471-3471
标识
DOI:10.3390/buildings14113471
摘要
In the context of high-quality development and the digital age, digital technology-enabled construction projects have become the only choice to promote organizational capabilities and innovation. However, the micro foundation of the organizational capabilities of construction projects has not been clarified, and its formation path is even less clear. This paper focuses on the characteristics of the times when digital technology and engineering construction are deeply integrated, conducts in-depth research on typical projects in the context of digital construction, and uses the qualitative research method of grounded theory to explore the antecedents of the formation of organizational capabilities. The results of the study establish a systematic antecedent model framework, including value integration, data traction, resource integration, technology integration, digital collaboration, and digital routines, and find out the “black box” process of the formation of construction project organizational capacities under the digital construction context. The conclusion of this study provides a theoretical basis and practical enlightenment for the construction of organizational capabilities of construction projects to cope with technological turbulence.
科研通智能强力驱动
Strongly Powered by AbleSci AI