预加载
有限元法
结构工程
涡轮机
放松(心理学)
刚度
材料科学
螺栓连接
控制理论(社会学)
工程类
机械工程
计算机科学
心理学
人工智能
内科学
血流动力学
控制(管理)
社会心理学
医学
作者
Hua Huang,Yonghe Wang,Tai Wei,Jiajing Yao,Wenhu Xue
标识
DOI:10.1177/09544054221124162
摘要
The preload relaxation is always caused by elastic interaction in the process of the wind turbine bolt tightening. To address the problem, the effects of the initial preload level, the tightening sequence on the preload are investigated based on theory calculation and finite element (FE) analysis. Moreover, this study proposes a preload optimization method based on the improved elastic interaction coefficient method (EICM), and the effectiveness of the method is verified by using FE analysis. The result shows that the improved EICM can be employed to analyze the interaction between the bolts, predict the variation of preload and confirm the initial preload that satisfies the pre-tighting conditions, as well as improve the practicality of the EICM and the calculation efficiency.
科研通智能强力驱动
Strongly Powered by AbleSci AI