数学优化
全局优化
调度(生产过程)
计算机科学
最优化问题
非线性规划
分界
整数规划
非线性系统
线性规划
作业车间调度
数学
地铁列车时刻表
物理
量子力学
操作系统
作者
Alessandro Alle,José M. Pinto
摘要
This work addresses the global optimization of the simultaneous problem of the cyclic scheduling and operation of multistage continuous plants. In this problem, production rates and yields are additional optimization variables for plant scheduling. The representation proposed for this problem is a mixed-integer nonlinear programming (MINLP) model that has a nonconvex feasible region and a nonconvex objective function. To address nonconvexity, a spatial branch-and-bound global optimization algorithm is developed to solve the model. An illustrative example shows that the global approach is effectively able to yield a more profitable solution than a local optimization algorithm. Moreover, it is shown that modifications in the steps of the global optimization algorithm, such as preferential branching at a variable, can significantly improve its performance. Results also show that local optimization can provide very good estimates for the global solution when processing conditions have narrow variability ranges and plants operate at nearly full capacity.
科研通智能强力驱动
Strongly Powered by AbleSci AI