座舱增压
堵塞
泥浆
合并(业务)
围堰
土地复垦
岩土工程
环境科学
石油工程
工程类
环境工程
机械工程
历史
会计
业务
考古
作者
Jianqi Wu,Xiang Liu,Xiang Luo,Hongtao Fu,Xiaobing Li,Ying Cai
标识
DOI:10.1080/1064119x.2022.2153767
摘要
The Marine slurry can be used for tideland reclamation projects; however, its high water content must be reduced. This article proposes a vacuum preloading-reverse prefabricated vertical drain (RPVD) method of slurry water reduction. Laboratory model tests of a vacuum preloading-prefabricated vertical drains (PVD) method and vacuum preloading-RPVD method were conducted to explore their effects on improving marine slurry foundations. Through comparative analysis, the vacuum preloading-RPVD method was found to provide better soil improvement. To solve the problem of clogging, this article proposes using an RPVD for pressurization. An RPVD was pressurized for different durations and certain variables during and after consolidation were monitored. The results show that, relative to the soil without air pressurization, the use of an RPVD for pressurization can significantly reduce clogging. The pressurization duration has a threshold, if the pressurization duration exceeds 45 min, the soil improvement effect will not be affected.
科研通智能强力驱动
Strongly Powered by AbleSci AI