磷
期限(时间)
环境科学
强化生物除磷
废物管理
化学
制浆造纸工业
环境工程
工程类
有机化学
物理
污水处理
量子力学
活性污泥
作者
Albert Guisasola,Carlos Chan,Oriol Larriba,Daniela Lippo,María Eugenia Suárez‐Ojeda,Juan Antonio
标识
DOI:10.1016/j.jclepro.2018.12.220
摘要
Phosphorus recovery is usually based on the chemical precipitation of struvite from the supernatant comming from anaerobic digestion of surplus sludge of wastewater treatment plants. However, the recovery of phosphorus from the mainstream would be very beneficial to the operation of the plant. This work represents a step forward in this challenge. The configuration of a sequencing batch reactor performing Enhanced Biological Phosphorus Removal (EBPR) was modified to include the extraction of a P-rich supernatant after a settling period. The liquid extracted after the anaerobic phase has the highest phosphorus concentration in all the reactor cycle and is therefore suitable for implementing P-recovery strategies. This is the first experimental system operated under this configuration and in a long-term basis (more than one year) under different influent COD/P ratios with good performance and stability. This work shows experimentally that up to 60% of the P could be extracted without a deleterious effect on EBPR. The system could even operate at high COD/P ratio (7.5) with high activity. Finally, anaerobic supernatant extraction was linked to anaerobic sludge purging and it was demonstrated that higher methane production (24.3%) was obtained compared to the default case with the sludge purged at the end of the aerobic phase.
科研通智能强力驱动
Strongly Powered by AbleSci AI