持续时间(音乐)
施工管理
合同管理
道路施工
运输工程
土木工程
工程类
公路养护
法律工程学
业务
文学类
艺术
营销
作者
Donn E. Hancher,James E. Rowings
出处
期刊:Journal of the Construction Division
[American Society of Civil Engineers]
日期:1981-06-01
卷期号:107 (2): 169-179
被引量:27
标识
DOI:10.1061/jcceaz.0000953
摘要
A research study was performed to evaluate the methodologies used by transportation agencies to establish the contract durations used for highway construction projects. The study was financed by the Indiana State Highway Commission (ISHC). After reviewing the system used in Indiana, those used by other transporation agencies were also studied. Methods used vary from broad conceptual estimates to detailed critical path scheduling techniques. A method is proposed for the ISHC which incorporates some of the advantages of critical path methods, but does not require the preparation of a graphic network. The method should provide more consistency in the determination of contract time estimates by highway personnel. It should also provide a schedule guide for the field engineers during construction.
科研通智能强力驱动
Strongly Powered by AbleSci AI