Vibration response and safety control for blasting vibration of the existing tunnel with defects

结构工程 振动 岩石爆破 工程类 航程(航空) 职位(财务) 岩土工程 法律工程学 声学 财务 物理 航空航天工程 经济
作者
Junying Xia,Bo Wang,Xinxin Guo,Z. Xie
出处
期刊:Underground Space [Elsevier BV]
卷期号:15: 76-89 被引量:2
标识
DOI:10.1016/j.undsp.2023.08.011
摘要

Current studies on blasting construction of small clear-distance tunnels have not considered the impact of existing tunnel lining defects when establishing safety controls. This paper offers a series of study results based on the blasting project of a new tunnel adjacent to the existing defect Xinling tunnel to thoroughly examine the dynamic response, safety control standards, and measures of the existing defect tunnel. First, structural models were developed to investigate the influence of the presence or absence of specific defects (like lining cracks and cavities behind the lining) on the dynamic response of the current tunnel lining to identify the most unfavorable defect distribution. Then, establish safety control standards for intact linings and those with the most unfavorable defects. Eventually, two types of control measures, single safe charge and reasonable delay time, were studied based on the established safety control standards. In particular, the most adverse position of cracks was the wall facing the explosion, the rise in depth was more unfavorable for vibration response, and the impact of the longitudinal crack was restricted to the vicinity of the crack. While the vault was the most adverse cavity position, the rise in cavity area was more damaging, and the influence range varied with longitudinal cavity length. Moreover, the impact of cracks was mainly evident in the amplification effect of stress at the crack region. In contrast, cavities had varied degrees of amplification effects on the vibration velocity and stress response and a relatively extensive influence range. Safety control research was conducted, when the tunnel was intact, with a right wall crack, a vault cavity, and both vault cavity and crack for this project, the peak particle velocity (PPV) of the safety control standard for vibration velocity was 13, 10, 13, and 8 cm/s, respectively, and the respective single safe charge could be adjusted at 64, 53, 37, and 25 kg. However, the presence of different defects had a relatively negligible effect on the reasonable delay time; 25 ms was recommended for existing tunnel lining with and without the defect.
最长约 10秒,即可获得该文献文件

科研通智能强力驱动
Strongly Powered by AbleSci AI
更新
PDF的下载单位、IP信息已删除 (2025-6-4)

科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
浮游应助Painkiller_采纳,获得10
1秒前
重要青柏完成签到,获得积分10
1秒前
Mh发布了新的文献求助10
1秒前
heyunxiang完成签到 ,获得积分10
2秒前
2秒前
3秒前
4秒前
王小明完成签到,获得积分10
4秒前
olivia完成签到,获得积分10
4秒前
wang完成签到,获得积分10
5秒前
小白鞋完成签到 ,获得积分10
6秒前
懦弱的博涛完成签到,获得积分10
7秒前
8秒前
8秒前
8秒前
9秒前
9秒前
9秒前
9秒前
9秒前
9秒前
9秒前
9秒前
淡淡的幻竹完成签到,获得积分10
9秒前
123456发布了新的文献求助10
9秒前
元骏发布了新的文献求助10
9秒前
10秒前
11秒前
11秒前
long0809完成签到,获得积分10
11秒前
bkagyin应助Unpaid采纳,获得10
12秒前
12秒前
奋斗的绝悟完成签到,获得积分10
13秒前
情怀应助Painkiller_采纳,获得10
14秒前
元骏发布了新的文献求助10
14秒前
元骏发布了新的文献求助10
14秒前
元骏发布了新的文献求助10
14秒前
元骏发布了新的文献求助10
14秒前
元骏发布了新的文献求助10
14秒前
元骏发布了新的文献求助10
14秒前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
Vertébrés continentaux du Crétacé supérieur de Provence (Sud-Est de la France) 600
A complete Carnosaur Skeleton From Zigong, Sichuan- Yangchuanosaurus Hepingensis 四川自贡一完整肉食龙化石-和平永川龙 600
FUNDAMENTAL STUDY OF ADAPTIVE CONTROL SYSTEMS 500
微纳米加工技术及其应用 500
Nanoelectronics and Information Technology: Advanced Electronic Materials and Novel Devices 500
Performance optimization of advanced vapor compression systems working with low-GWP refrigerants using numerical and experimental methods 500
热门求助领域 (近24小时)
化学 材料科学 医学 生物 工程类 有机化学 生物化学 物理 纳米技术 计算机科学 内科学 化学工程 复合材料 物理化学 基因 遗传学 催化作用 冶金 量子力学 光电子学
热门帖子
关注 科研通微信公众号,转发送积分 5306536
求助须知:如何正确求助?哪些是违规求助? 4452296
关于积分的说明 13854370
捐赠科研通 4339755
什么是DOI,文献DOI怎么找? 2382830
邀请新用户注册赠送积分活动 1377724
关于科研通互助平台的介绍 1345400