规划师
能力(人力资源)
旷工
计算机科学
调度(生产过程)
运筹学
先验与后验
风险分析(工程)
作业车间调度
稳健性(进化)
运营管理
过程管理
知识管理
业务
地铁列车时刻表
人工智能
工程类
经济
管理
基因
认识论
操作系统
哲学
化学
生物化学
作者
Grzegorz Bocewicz,Jarosław Wikarek,Paweł Sitek,Zbigniew Banaszak
出处
期刊:Advances in intelligent systems and computing
日期:2019-09-05
卷期号:: 16-30
被引量:3
标识
DOI:10.1007/978-3-030-30604-5_2
摘要
To ensure proper functioning of an organization (e.g. production system) in settings in which there exists a risk of disruptions caused by unexpected employee absenteeism and/or a changing demand for employees with specific qualifications, one must move away from traditional approaches oriented towards the determination of procedures for generating workable baseline schedules that minimize the project makespan in a deterministic environment. The planner must take into account time uncertainties caused by an unexpected deviation of activity durations and resource availability uncertainties related to the fact that execution of tasks in a project depends on the availability of resources. The aim of this study was to develop a method "determining" a competence structure of employees, allowing for realizing proactive planning robust to unexpected staff absenteeism. To this end, we proposed a procedure for designing a competence framework that returns competence structures robust to disruptions caused by employee absenteeism. The procedure, derived from a declarative model, can be used to determine structures that allow to substitute redundant competences, thus ensuring robustness of the generated schedules to the types of absenteeism that are known a priori. The possibilities of practical application of the presented approach are illustrated with examples.
科研通智能强力驱动
Strongly Powered by AbleSci AI