电压暂降
电压降
可靠性(半导体)
煤矿开采
电压
汽车工程
功率(物理)
下降(电信)
可靠性工程
工程类
电力系统
电气工程
煤
电能质量
废物管理
物理
量子力学
出处
期刊:Journal of physics
[IOP Publishing]
日期:2021-09-01
卷期号:2033 (1): 012098-012098
标识
DOI:10.1088/1742-6596/2033/1/012098
摘要
Through the investigation and test of the interference of AC power supply in coal mine, it is found that when the high-power equipment is started or stopped, the obvious voltage drop phenomenon is often caused on the power network, which affects the reliable work of the safety monitoring system connected to the power network. This paper tests the situation of voltage drop on site, and analyzes and verifies the influence of this kind of voltage drop on the stable operation of the monitoring system. When the voltage drops, the equipment may restart, which seriously threatens the normal production safety. Finally, in order to ensure the safe and stable operation of the monitoring system, this paper puts forward some suggestions on the design of uninterrupted power box.
科研通智能强力驱动
Strongly Powered by AbleSci AI