风险管理
项目风险管理
控制(管理)
问卷调查
风险控制
风险评估
项目管理
工程类
风险分析(工程)
业务
运营管理
环境规划
环境资源管理
项目管理三角形
计算机科学
地理
环境科学
系统工程
财务
社会科学
人工智能
社会学
计算机安全
作者
Xiaosen Huo,Hao Xue,Liudan Jiao
标识
DOI:10.1016/j.enbuild.2022.112708
摘要
The green retrofit of old residential areas is an important approach to promote urban renewal and to realize the sustainable development of existing buildings. However, the various risks in retrofit projects hinder the progress. In this study, a list of risk factors of retrofit projects in Old Residential Areas (ORAs) is built from whole life cycle of a project, the opinions of participants on the possibility of risk factors and the degree of impact on the project were collected through the questionnaire survey, a risk assessment model based on C-OWA and grey cluster analysis is developed to evaluate the risk, and risk management and control are proposed based on different risk levels. A case study is carried out by taking a retrofit project in Chongqing A-zone as an example to assess the comprehensive risk in this project, and corresponding recommendations for risk control of the retrofit project are provided. The research findings provide references for risk management of retrofit project in ORAs.
科研通智能强力驱动
Strongly Powered by AbleSci AI