备品备件
不完美的
预防性维护
接头(建筑物)
可靠性工程
计算机科学
灵敏度(控制系统)
运筹学
订单(交换)
运营管理
数学优化
工程类
业务
数学
电子工程
语言学
哲学
建筑工程
财务
作者
Yong He,Hong Wang,Xiujie Zhao
摘要
Abstract The joint optimization of various maintenance actions and the supply of spare parts has received extensive attention in recent years owing to its advantage in reducing the overall operational costs of industrial systems. In this study, a joint optimization model is proposed considering bi‐level imperfect preventive maintenance and spare part ordering. A virtual age reduction model that considers bi‐level imperfect preventive maintenance (PM) is established. Upon each system shutdown, the PM level is determined based on the cost‐effectiveness ratio. Furthermore, an improved (s, S) inventory policy is proposed utilizing the information of the remaining number of PM and accumulated consumption of spare parts. Finally, the joint optimization models consisting of different PM policies and spare parts inventory policies are solved. Case studies show that compared with the traditional (s, S) inventory policy, the proposed joint optimization model can coordinate the ordering quantity of spare parts with the PM policy, and reduce the expected maintenance cost. A sensitivity analysis of the cost parameters is performed to explore their impact on the maintenance economy.
科研通智能强力驱动
Strongly Powered by AbleSci AI