詹姆斯·韦伯太空望远镜
主镜像
望远镜
软件部署
次镜
天文台
有源光学
项目调试
光学望远镜
光学
反射望远镜
斯皮策太空望远镜
物理
航空航天工程
计算机科学
天文
工程类
操作系统
出版
艺术
文学类
作者
Lee D. Feinberg,Erin Wolf,Scott T. Acton,Scott S. Knight,Matthew Lallo,Marshall D. Perrin,Paul R. Reynolds,Joseph M. Howard,Alden S. Jurling,Ritva Keski-Kuha,Thomas P. Zielinski
摘要
The James Webb Space Telescope (JWST) launched on December 25th, 2021. The observatory was deployed and commissioned during its first six months. The Optical Telescope Element includes both large deployments of the Deployable Tower Assembly, Secondary Mirror Support Structure and the Primary Mirror Wings and it includes the deployment and alignment of the 18 primary mirror segments and the secondary mirror. The initial phase included cooldown and ice mitigation efforts followed by telescope deployments, mirror deployment and wavefront sensing and control. This paper will discuss the entire OTE commissioning from deployment through alignment including a discussion of results and lessons learned.
科研通智能强力驱动
Strongly Powered by AbleSci AI