持续时间(音乐)
模糊逻辑
质量(理念)
项目管理
项目策划
计算机科学
项目经理
集合(抽象数据类型)
项目管理三角形
总成本
运筹学
数学优化
工程类
系统工程
人工智能
数学
认识论
文学类
哲学
艺术
经济
微观经济学
程序设计语言
作者
Dang-Trinh Nguyen,Long Le‐Hoai,Putri Basenda Tarigan,Duc-Hoc Tran
标识
DOI:10.1016/j.aej.2021.06.058
摘要
Time cost and quality are three important factors in planning and controlling construction projects. Getting these factors in balance, which minimizes the project duration, the total project cost, and maximizes the total quality could define the success of a construction project. Aside from planning and estimating the project properly, a consideration of uncertainty while implementing the project is needed to represent a more realistic outcome for time, cost, and quality trade-off (TCQT) problem in construction projects. In this paper, fuzzy logic is utilized to model the uncertainty embedding α-cut approach to see the effect of the uncertainty on the time, cost, and quality of the project. Then multi-objective Symbiotic Organism Search (SOS) algorithm is applied to find a set of the optimal solution in different uncertainty levels and provide the project manager several possible actions to implement the project. Two numerical case studies of a repetitive construction project were analyzed to see the effectiveness of the model and its capability to solve the TCQT problem in the construction project. The results showed that the proposed model is powerful to explore the solution for the shortest project duration with minimum incurred cost and high overall quality in the construction project. In comparison to the other widely used methods and other algorithms, the proposed model is proven to be effective and competitive in solving the TCQT problem.
科研通智能强力驱动
Strongly Powered by AbleSci AI