微电网
粒子群优化
能源管理
计算机科学
电动汽车
算法
储能
能源管理系统
汽车工程
分布式发电
数学优化
工程类
能量(信号处理)
可再生能源
功率(物理)
数学
电气工程
统计
物理
量子力学
作者
Hamid Ghobadi Lamouki,Hassan Shokouhandeh,Mehrdad Ahmadi Kamarposhti,Fariba Asghari Matankolaei,Sanjeevikumar Padmanaban,Sun-Kyoung Kang,Ilhami Colak
标识
DOI:10.1142/s0218126624501354
摘要
In this paper, a dynamic parameters lightning search algorithm (DP-LSA) is proposed for optimal operation management of electric vehicle (EV) parking lots (PLs) and distributed generations (DGs) in a microgrid (MG). The MG comprises distributed generation sources such as diesel generators and fuel cells. The batteries of electric vehicles parked in the PL are also used for energy storage. A proposed objective function combines operating, maintenance, and replacement costs, considering inflation, motivation, and annual growth. Simulations are done in two scenarios, and the proposed algorithm results are compared with particle swarm optimization (PSO) algorithm results. Simulation results prove the better performance of the proposed LSA algorithm than the PSO algorithm in reducing the microgrid operation cost.
科研通智能强力驱动
Strongly Powered by AbleSci AI