多物理
岩土工程
拱坝
拱门
有限元法
压力(语言学)
流离失所(心理学)
应力场
地质学
基础(证据)
结构工程
工程类
考古
哲学
心理治疗师
历史
语言学
心理学
出处
期刊:Chinese journal of rock mechanics and engineering
日期:2013-01-01
被引量:5
摘要
Based on M language offered by COMSOL Multiphysics,a full coupled analysis model was developed, and the corresponding calculating program was complied. And then,a three-dimensional finite element model of an arch dam located on Yellow River was established. The coupled seepage-stress field was compared with uncoupled condition under a selected reservoir operation case. The seepage field,stress field and displacement field were analyzed for deep understanding of the significance of coupling analysis in the high arch dam. The results showed the same distribution of seepage,stress and displacement fields in those two cases. However, compared with the uncoupled case,the equipotential lines of seepage field were close to downstream. Every displacement component increased at different rates,the tensile stress of the upstream rock increased and the compressive stress of the downstream rock also increased in the coupled case. The uplift pressure increased in the foundation and it was not beneficial to the stability of the dam. So,it is necessary to consider the coupled seepage-stress effect for high arch dam.
科研通智能强力驱动
Strongly Powered by AbleSci AI