套管
石油工程
钻井液
定向钻
磁导率
流离失所(心理学)
钻探
钻井
岩土工程
钻杆
地质学
完井(油气井)
演习
钻孔
工程类
机械工程
心理学
膜
生物
心理治疗师
遗传学
出处
期刊:Spe Drilling Engineering
日期:1988-09-01
卷期号:3 (03): 275-280
被引量:29
摘要
Summary Obtaining a successful cement job will remain one of the most important factors to the productive life of any well and will be especially critical for horizontal-well completions. Achieving a high mud-displacement efficiency under highly deviated or horizontal-well conditions requires that special attention be given to the many aspects of drilling/completion practices—e.g., drill-fluid systems and properties and casing and hole sizes—to obtain optimum mud displacement and cementing results. A study of factors affecting mud-displacement efficiency focused on cementing an ultralow-permeability formation that is being evaluated as a subject for horizontal completion. Realistic laboratory testing was conducted on a large-scale test model that has been used for many years to evaluate factors influencing drilling-fluid-displacement efficiency. Factors evaluated for this study included influence of hole and pipe sizes, pipe centralization, displacement rates, and spacer systems. Findings from this study provided specific recommendations for low-permeability reservoirs that also can be applied to horizontally drilled wells. Various techniques for cementing horizontal wells will be discussed and general recommendations will be given.
科研通智能强力驱动
Strongly Powered by AbleSci AI