计算机科学
调度(生产过程)
可扩展性
数学优化
分布式计算
作业车间调度
灵活性(工程)
数学
嵌入式系统
统计
数据库
布线(电子设计自动化)
作者
Zhe Zhang,Kazuhiro Izui,Xiaoling Song,Yong Yin,Xue Gong
标识
DOI:10.1016/j.jmse.2023.11.003
摘要
This paper investigates the production scheduling problems of allocating resources and sequencing jobs in the seru production system (SPS). As a the new-type manufacturing mode arising from Japanese production practices, seru production can achieve efficiency, flexibility, and responsiveness simultaneously. The production environment in which a set of jobs must be scheduled over a set of serus according to due date and different execution modes is considered, and a combination optimization model is provided. Motivated by the problem complexity and the characteristics of the proposed seru scheduling model, a nested partitioning method (NPM) is designed as the solution approach. Finally, computational studies are conducted, and the practicability of the proposed seru scheduling model is proven. Moreover, the efficiency of the nested partitioning solution method is demonstrated by the computational results obtained from different scenarios, and the good scalability of the proposed approach is proven via comparative analysis.
科研通智能强力驱动
Strongly Powered by AbleSci AI