数学优化
作业车间调度
人口
计算机科学
能源消耗
调度(生产过程)
工作量
工作车间
工程类
地铁列车时刻表
流水车间调度
数学
操作系统
电气工程
社会学
人口学
作者
Deming Lei,You-Lian Zheng,Xiuping Guo
标识
DOI:10.1080/00207543.2016.1262082
摘要
Flexible job shop scheduling problem (FJSP) has been extensively investigated and objectives are often related to time. Energy-related objective should be considered fully in FJSP with the advent of green manufacturing. In this study, FJSP with the minimisation of workload balance and total energy consumption is considered and the conflicting between two objectives is analysed. A shuffled frog-leaping algorithm (SFLA) is proposed based on a three-string coding approach. Population and a non-dominated set are used to construct memeplexes according to tournament selection and the search process of each memeplex is done on its non-dominated member. Extensive experiments are conducted to test the search performance of SFLA and computational results show the conflicting between two objectives of FJSP and the promising advantages of SFLA on the considered FJSP.
科研通智能强力驱动
Strongly Powered by AbleSci AI