期限(时间)
输电塔
塔楼
传输(电信)
预警系统
计算机科学
遥感
环境科学
地质学
电信
工程类
土木工程
量子力学
物理
作者
Li Zhang,Jiangjun Ruan,Du Zhang,Wei Zhou,Guannan Li,Yan Gan
出处
期刊:IEEE Access
[Institute of Electrical and Electronics Engineers]
日期:2020-01-01
卷期号:8: 10455-10465
被引量:20
标识
DOI:10.1109/access.2020.2964426
摘要
Crustal movement and land subsidence will cause tower foundation settlement, which seriously affects the safety of transmission line operation. This paper proposed a short-term failure warning method for transmission tower under land subsidence condition based on finite element method, strain monitoring and time series prediction. By simulating the stress distribution of the tower in actual foundation settlement, the weak components of the settlement tower were founded. Combined with the finite element simulation results in various conditions, the reliability of simulation results is verified, and the strain variation range of the corresponding measuring point is obtained. By installing the real-time strain monitoring system and establishing the autoregressive integrated moving average (ARIMA) time series forecast model, warning of the failure of the tower can be sounded in short time according to the strain monitoring and forecasting results. The field results show that the tower is in good condition and with no risk in short term. The method proposed by this paper is economical and easy to operate, which can be used to conduct the emergency treatment of the dangerous tower under land subsidence condition.
科研通智能强力驱动
Strongly Powered by AbleSci AI