固结仪试验
堤防
工程类
岩土工程
结算(财务)
判断
地铁列车时刻表
土木工程
试验数据
土壤水分
计算机科学
地质学
万维网
法学
土壤科学
付款
软件工程
操作系统
政治学
作者
James Doherty,M. F. Bransby
出处
期刊:Geotechnique
[Thomas Telford Ltd.]
日期:2021-11-01
卷期号:71 (11): 1014-1027
被引量:4
标识
DOI:10.1680/jgeot.19.sip.015
摘要
Models of soil behaviour, in situ and laboratory testing techniques and system models for describing the geometry and time-dependent processes involved in the settlement of embankments on soft soils have reached a level of maturity where reliable predictions for this problem should be readily achievable. Despite this, there is clear evidence to demonstrate engineering predictions of embankment behaviour can be inaccurate, resulting in construction cost and schedule overruns. One key reason for this is the significant influence that personal judgement plays in processing soil test data to derive engineering parameters. In this paper, a method that makes progress toward overcoming this is developed using oedometer test results directly in a data-driven approach, thus avoiding the need to evaluate profiles of compression indices and yield pressures. The method has been deployed as an easy-to-access cloud-based application and its use demonstrated with a comprehensive case history. Data used in this paper are freely available in electronic format.
科研通智能强力驱动
Strongly Powered by AbleSci AI