页面布局
工厂(面向对象编程)
设计布置记录
IC布局编辑器
物料搬运
计算机科学
生产(经济)
工程制图
集成电路布局
生产计划
制造工程
可靠性工程
工程类
电路提取
集成电路
电压
程序设计语言
等效电路
经济
业务
宏观经济学
电气工程
广告
操作系统
作者
Didien Suhardini,Winnie Septiani,Sarah Noer Fauziah
出处
期刊:IOP conference series
[IOP Publishing]
日期:2017-12-01
卷期号:277: 012051-012051
被引量:36
标识
DOI:10.1088/1757-899x/277/1/012051
摘要
This research aims to design the factory layout of PT. Gunaprima Budiwijaya in order to increase production capacity. The problem faced by this company is inappropriate layout causes cross traffic on the production floor. The re-layout procedure consist of these three steps: analysing the existing layout, designing plant layout based on SLP and evaluation and selection of alternative layout using Simulation Pro model version 6. Systematic layout planning is used to re-layout not based on the initial layout. This SLP produces four layout alternatives, and each alternative will be evaluated based on two criteria, namely cost of material handling using Material Handling Evaluation Sheet (MHES) and processing time by simulation. The results showed that production capacity is increasing as much as 37.5% with the addition of the machine and the operator, while material handling cost was reduced by improvement of the layout. The use of systematic layout planning method reduces material handling cost of 10,98% from initial layout or amounting to Rp1.229.813,34.
科研通智能强力驱动
Strongly Powered by AbleSci AI