过程(计算)
冲突分析
冲突解决
选择(遗传算法)
冲突解决研究
公共基础设施
过程管理
环境资源管理
业务
风险分析(工程)
政治学
计算机科学
经济
法学
人工智能
操作系统
作者
Jang Hee Min,Woosik Jang,Seung Heon Han,Doyun Kim,Young Hoon Kwak
出处
期刊:Journal of Management in Engineering
[American Society of Civil Engineers]
日期:2018-04-25
卷期号:34 (4)
被引量:49
标识
DOI:10.1061/(asce)me.1943-5479.0000625
摘要
This study proposes a conflict analysis framework to investigate how conflict occurs and what causes conflict by considering the characteristics of public infrastructure projects. The conflict occurrence process over construction projects was structured as four stages based on the paradigm model approach of grounded theory. Two types of Korean cases (the first one is linear facilities and the second one is clustered facilities) were analyzed using the proposed framework. The study examined that each infrastructure type has its own pattern during conflict occurrences, with the impact of conflict factors also varying significantly. The results showed that the "procedure of deciding facility's location and its route" is commonly extracted as a major factor. For linear infrastructure facilities, "the validity of the public engagement process" and "technical alternatives to mitigate conflict" were distilled as major factors. In contrast, "environmental and ecological concerns in the early site selection phase," because the facility required a large amount of territory, was identified as more important for clustered infrastructure facilities. This framework is expected to be useful for conflict analysis from the early stage of public projects, according to the inherent characteristics of the given infrastructure project.
科研通智能强力驱动
Strongly Powered by AbleSci AI