亲爱的研友该休息了!由于当前在线用户较少,发布求助请尽量完整地填写文献信息,科研通机器人24小时在线,伴您度过漫漫科研夜!身体可是革命的本钱,早点休息,好梦!

Study on the distribution law of vertical earth pressure in the construction of a metro station using PBA method in a loess stratum

拱门 搭扣 侧向土压力 地质学 黄土 航向(导航) 岩土工程 结构工程 工程类 大地测量学 地貌学
作者
Xuexuan Shang,Shaoxiong Wang,Hanjuan Yao,Qi Liu,Xiaojing Zheng,Qingrui Chen,Kang Yang
标识
DOI:10.1117/12.2645771
摘要

The PBA method is essential to master vertical earth pressure distribution law in the subway station construction in the loess layer. Based on the engineering background of the Hejiaying Station of Xi'an Metro, this paper investigates the vertical earth pressure distribution of headings and buckle arches under different construction sequences based on numerical simulation and compares them with measured on-site data. The research results indicate the following. (1) The vertical earth pressure at the arch springing of headings A and D in the upper layer is approximately 1.06 times the vertical earth pressure at the arch crown. Moreover, the vertical earth pressure at the arch springing of headings B and C in the upper middle is approximately 1.015 times the vertical earth pressure at the arch crown, signifying that the vertical earth pressure at the middle heading B and C is more evenly distributed. (2) Comparing the different excavation sequences of the same layer of caves, the two sequences "excavating the upper layer first and then the lower layer" and "excavating the lower layer first and then excavating the upper layer" have a more significant impact on the vertical earth pressure of the headings. The heading initially excavated bears the slightest vertical earth pressure. (3) If Scheme 2 is applied to construct the buckle arch, the vertical earth pressure at the junction of the buckle arch and the heading is relatively large, approximately 1.69 times the vertical earth pressure of the buckle arch. Meanwhile, if Scheme 1 is applied for buckle arch construction, the force on the upper part of the buckle arch is relatively uniform. However, the earth pressure on the top of the arch is more significant than that of Scheme 2. It signifies that the earth pressure at the middle part of the arch is mainly transferred to the two ends of the arch when construction is performed using Scheme 2.
最长约 10秒,即可获得该文献文件

科研通智能强力驱动
Strongly Powered by AbleSci AI
更新
PDF的下载单位、IP信息已删除 (2025-6-4)

科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
2秒前
Bella发布了新的文献求助10
6秒前
yx_cheng应助qcq采纳,获得20
6秒前
karea发布了新的文献求助10
10秒前
11秒前
12秒前
小庄完成签到 ,获得积分10
14秒前
国色不染尘完成签到,获得积分10
19秒前
闪闪的谷梦完成签到 ,获得积分10
22秒前
在水一方应助张绵羊采纳,获得10
24秒前
25秒前
gxh66完成签到,获得积分10
30秒前
青枫发布了新的文献求助30
31秒前
无花果应助Ni采纳,获得10
35秒前
37秒前
爆米花应助孔雪采纳,获得10
38秒前
40秒前
41秒前
脑洞疼应助cccccccc采纳,获得10
42秒前
42秒前
Ni发布了新的文献求助10
45秒前
qcq完成签到,获得积分10
46秒前
研友_VZG7GZ应助科研通管家采纳,获得10
47秒前
bkagyin应助科研通管家采纳,获得10
47秒前
熊巴巴完成签到 ,获得积分10
47秒前
47秒前
47秒前
49秒前
Ni完成签到 ,获得积分20
52秒前
张绵羊发布了新的文献求助10
54秒前
脑洞疼应助感动的春天采纳,获得30
57秒前
58秒前
1分钟前
Heng发布了新的文献求助10
1分钟前
1分钟前
青枫完成签到,获得积分10
1分钟前
1分钟前
eye发布了新的文献求助30
1分钟前
陈C完成签到 ,获得积分10
1分钟前
科研通AI2S应助嗯哼哈哈采纳,获得10
1分钟前
高分求助中
Ophthalmic Equipment Market by Devices(surgical: vitreorentinal,IOLs,OVDs,contact lens,RGP lens,backflush,diagnostic&monitoring:OCT,actorefractor,keratometer,tonometer,ophthalmoscpe,OVD), End User,Buying Criteria-Global Forecast to2029 2000
A new approach to the extrapolation of accelerated life test data 1000
Cognitive Neuroscience: The Biology of the Mind 1000
Technical Brochure TB 814: LPIT applications in HV gas insulated switchgear 1000
Immigrant Incorporation in East Asian Democracies 500
Nucleophilic substitution in azasydnone-modified dinitroanisoles 500
不知道标题是什么 500
热门求助领域 (近24小时)
化学 材料科学 医学 生物 工程类 有机化学 生物化学 物理 内科学 纳米技术 计算机科学 化学工程 复合材料 遗传学 基因 物理化学 催化作用 冶金 细胞生物学 免疫学
热门帖子
关注 科研通微信公众号,转发送积分 3965604
求助须知:如何正确求助?哪些是违规求助? 3510843
关于积分的说明 11155405
捐赠科研通 3245345
什么是DOI,文献DOI怎么找? 1792840
邀请新用户注册赠送积分活动 874118
科研通“疑难数据库(出版商)”最低求助积分说明 804188