工厂(面向对象编程)
产品(数学)
生产(经济)
页面布局
原材料
运营管理
过程(计算)
制造工程
工程制图
工程类
计算机科学
业务
数学
经济
操作系统
广告
宏观经济学
有机化学
化学
程序设计语言
几何学
作者
K. Bintang Bagaskara,Lina Gozali,Lamto Widodo
出处
期刊:IOP conference series
[IOP Publishing]
日期:2020-07-01
卷期号:852 (1): 012122-012122
被引量:16
标识
DOI:10.1088/1757-899x/852/1/012122
摘要
Abstract CV Oto Boga Jaya (Oto Bento) is one of the largest industries which is producing Japanese food that is located in Bogor City and has many franchise partners throughout Indonesia. CV Oto Boga Jaya has the most significant problem and complained by most employees and operators (interview results) is a matter of factory layout between the raw material warehouse and the production area where the position of the two departments has an excess of more than 29 meters and takes time more than 10 minutes for one move. Therefore, researcher conducted observations and data processing with systematic layout planning (SLP) methods to design a new factory layout for CV Oto Boga Jaya. The processed data is the Operation Product Chart (OPC) data by selecting the product that has the highest and longest production process named shrimp roll, routing sheet, material handling costs, and initial layout as a reference. Then after conducting the research, the results obtained are in the form of 2 alternative layouts with distances and positions of different departments that have been processed in the FTC, ARC, ARD, AAD. The results of this study were chosen alternative layout 2, because it has shorter inter-departmental distances, a more orderly production / administration process, and fewer room intersections compared to alternative layout 1.
科研通智能强力驱动
Strongly Powered by AbleSci AI