开裂
材料科学
材料性能
材料强度
土木工程
结构工程
岩土工程
工程类
复合材料
作者
Bohu Zhang,S.C. Fan,Juzhi Deng
标识
DOI:10.1179/1432891715z.0000000002126
摘要
In the construction of highway tunnels, the lining material is mainly composed of reinforced concrete. However, this lining concrete will crack if it does not have sufficient strength. Such cracks will aggravate internal reinforced material rust, impacting the tunnel's safety and waterproofness. Once a highway tunnel has been in operation for 2 years, cracks become apparent. To assess the cracks, highway tunnel construction was investigated, and the causes were analysed on convergence of tunnel section, material strength test and numerical simulation. Possible factors in the design, construction and operation stages were also researched, such as partial pressure; material strength and engineering geology. The concept of quality management in the whole process is proposed. In addition, it is crucial to choose the appropriate materials to reinforce in a timely manner, to avoid too much cracking and ensure long-term stability. The research results have great significance for the safety control and management of highway tunnels.
科研通智能强力驱动
Strongly Powered by AbleSci AI