锻造
瓶颈
生产线
模具(集成电路)
生产(经济)
制造工程
过程(计算)
生产周期
直线(几何图形)
任务(项目管理)
计算机科学
工业工程
工程类
工程制图
机械工程
系统工程
运营管理
操作系统
数学
宏观经济学
经济
几何学
作者
Qiang Cheng,Hongchao Shen,Hongyan Chu,Zhifeng Liu,Caixia Zhang,Jiaxiang Ren
出处
期刊:Journal of physics
[IOP Publishing]
日期:2020-10-01
卷期号:1624 (2): 022063-022063
被引量:3
标识
DOI:10.1088/1742-6596/1624/2/022063
摘要
Abstract Long forging production cycle and low equipment utilization are the important problems currently facing domestic die forging ring production lines. To solve this problem, a simulation optimization method for die forging production line based on Flexsim was proposed. Firstly, the ECRS theory method was used to analyze the bottleneck process of the production line. Then, built a logistics simulation model of die forging production line based on Flexsim, The parallel and cycle processing steps was set reasonable parameters and simulated. Next, through logic analysis, methods such as adding processing equipment, improving equipment efficiency and balancing equipment handling tasks were used to optimize and improve the production line. Finally, compared and analyzed the original and optimized model. The simulation results show that the optimized production line equipment task allocation tends to be rationalized, the equipment utilization rate is increased by 4.34%, and the product cycle time is reduced by 27.65%, and optimized planning and design are achieved.
科研通智能强力驱动
Strongly Powered by AbleSci AI