计算机科学
启发式
服务(商务)
采购
运筹学
调度(生产过程)
整数规划
服务水平
线性规划
启发式
度量(数据仓库)
网络规划与设计
总线网络
控制总线
运营管理
电信
数据库
系统总线
工程类
操作系统
经济
人工智能
经济
统计
数学
算法
作者
W. Lampkin,P. D. Saalmans
摘要
This paper describes a case study of the reorganization of a municipal bus undertaking. The terms of reference were to consider reorganizing the route structure, to advise on frequencies to operate on the chosen routes, to compile timetables, and to design bus schedules so that the recommended system could be implemented with the minimum number of active buses. Theoretically, all of these variables can interact and one global model should be used to optimize the entire system simultaneously. In practice, the components of this problem had to be uncoupled and tackled separately. An heuristic model designed to provide a "good" route network was developed. Service frequencies were allocated to routes so that a measure of service to passengers was maximized. Bus timetables were compiled using conventional methods and a linear programming model used to assign individual buses to journeys. A new scheme based on the recommendations of the study has been implemented. It is expected that it will reduce the annual operating deficit by [pound]35,000 without appreciably decreasing the overall level of service offered.
科研通智能强力驱动
Strongly Powered by AbleSci AI