胶凝的
灰浆
材料科学
剪切(地质)
衍生工具(金融)
水泥
复合材料
结构工程
矿物学
地质学
工程类
金融经济学
经济
作者
Jingwen Zhu,Junnan Cao,Bate Bate,Kamal H. Khayat
标识
DOI:10.1016/j.cemconres.2018.01.013
摘要
Although identified as a good indicator to characterize freshly cast cementitious materials, shear wave velocity (Vs) alone has not been used successfully to determine the initial and final setting times (ti and tf). The challenge originates from the large Vs range that can vary from <50 m/s to >2000 m/s for cementitious materials at early age (typically <24 h). To overcome these challenges, modifications to traditional bender element and to specimen geometry were made to obtain Vs versus time (Vs(t)) curves of six early age mortars at different water-to-cement ratios, some with chemical admixtures. Derivative methods were then proposed to obtain ti and tf. The peak time (tpeak′) in the first-order derivative of Vs(t) curves correlate well to the final setting time (R2 = 0.979), while the peak time (tpeak″) of the second-order derivative of Vs(t) curves correspond well to the initial setting time (R2 = 0.950).
科研通智能强力驱动
Strongly Powered by AbleSci AI