可靠性工程
可靠性(半导体)
可靠性
生产(经济)
马尔可夫过程
马尔可夫链
马尔可夫模型
计算机科学
过程(计算)
预防性维护
工程类
数学
统计
物理
宏观经济学
机器学习
经济
功率(物理)
操作系统
量子力学
作者
Naima Tamaloussi,Azzedine Bouzaouit
出处
期刊:Acta Universitatis Sapientiae
日期:2020-12-01
卷期号:12 (1): 66-76
标识
DOI:10.2478/auseme-2020-0005
摘要
Abstract In the industrial sector, maintenance of production facilities plays an important role to carry out production by increasing the reliability and availability of the production process. Predictive maintenance strategy seems adequate to anticipate the failure and degradation of the state of such equipment. A reliability study is needed to quantify indicators to describe the functioning of any system over time. In this paper, we present the results of a stochastic modeling conducted on the analysis of the availability of motor-pump system, installed in a cooling circuit in an industrial complex. The equipment considered in this study is composed of four subsystems. The proposed model is a dynamic Markovian approach, for the purpose of a comparison with the analytical calculation in terms of the indicators’ evaluation of the dependability of the studied system, including instant availability. The different states of the system components and the transition functions between these states have also been characterized. The results of availability obtained by the model are well correlated with those calculated analytically, confirming that the proposed model is very powerful, it will help predict the future states of the system, in order to predict any necessary preventive maintenance actions.
科研通智能强力驱动
Strongly Powered by AbleSci AI