Climate Feedback–Based Provisions for Dam Design, Operations, and Water Management in the 21st Century

水资源 人口 供水 中国 水利工程 人口增长 比例(比率) 气候变化 地理 水资源管理 环境科学 环境工程 生态学 物理 人口学 地图学 考古 社会学 生物 热力学
作者
Faisal Hossain,Ahmed M. Degu,Wondmagegn Yigzaw,Steven J. Burian,Dev Niyogi,J. Marshall Shepherd,Roger A. Pielke
出处
期刊:Journal of Hydrologic Engineering [American Society of Civil Engineers]
卷期号:17 (8): 837-850 被引量:56
标识
DOI:10.1061/(asce)he.1943-5584.0000541
摘要

As the world’s population increases, the rising demand for water will be compounded further by the need to sustain economic growth (Vorosmarty et al. 2000). According to one report by the United Nations Environment Program (UNEP), the stress on freshwater resources is expected to significantly magnify and spread to other regions of the world by 2025 (see Fig. 1; UNEP 2002). Historically, one of the common engineering solutions to guarantee a steady water supply against a rising demand has been to construct surface water impoundments on rivers. Such large-scale infrastructure, commonly known as dams and artificial reservoirs, trap a sufficiently large amount of water from the local hydrologic cycle to make up for a shortfall when demand exceeds the variable supply from nature. In other words, dams can be regarded as a strategic (long-term) solution to resolve the tactical (short-term) challenges of balancing the water deficit compounded by population growth and economic activity. In the United States, statistics suggest that building dams is outdated and considered a twentieth-century construct by the civil engineering profession (Fig. 2) Graf et al. 2010; Graf 1999). However, for vast regions of the underdeveloped or developing world, large dam-construction projects are being implemented in increasing numbers for tackling the rising water deficit in emerging economies (Fig. 3). Examples of such large dam projects are the Southeast Anatolia Project, or GAP (Turkish acronym) project, in Turkey, comprising 22 dams on the Tigris and Euphrates rivers (Unver 1997), the Three Gorges Dam (TGD) in China (Shen and Xie 2004), Itaipu Dam in Brazil (Pierce 1995), and the proposed Indian River Linking Project (Misra et al. 2007). From a global perspective, dam operations and water management in impounded basins remain relevant worldwide, while dam design and building are pertinent mostly to the developing world, comprising Africa, South America, and Asia, where most of the rivers remain unregulated. The heritage of modern dam building is nearly a century old. For example, the construction of the oldest dam in the Tennessee River Valley, called the Wilson Dam in Alabama, began in 1918 (Gebregiorgis and Hossain 2012). With a long heritage built on knowledge gained from previous failures and success stories, the civil engineering profession has made tremendous progress in dam safety against hazards of earthquakes (e.g., Marcuson et al. 1996), piping/seepage (e.g., Casagrande 1961; Sherard 1987), structural instability (e.g., Terzaghi and LaCroix 1964; Vick and Bromwell 1989), and optimization of dam operations to serve multiple, but competing, applications (Dai and Labadie 2001; Datta and Burges 1984). Similarly, much is now known about the management of postdam effects on aquatic ecology (e.g., Ligon et al. 1995; Richter et al. 1996), riparian vegetation (e.g., Merritt and Cooper 2000), geomorphology (e.g., Graf 2006), and dam removal as a result of sedimentation (Morris and Fan 1998; Graf et al. 2010). In general, the aspects of dam design and operations that have improved during the last century are those that are directly visible or have instantaneous impact on the land surface. This is not surprising, as the essence of engineering is hands-on in nature. What can be touched, sensed, and immediately visualized in the real world can be accounted for in the design and operation of an infrastructure. For example, the importance of fish ladders to minimize the disturbance to predam fish-migration paths was quickly appreciated by the engineering community during the early history of dam building. Now fish ladders are a common provision during the planning of a dam along a river. Similarly, when the Teton Dam failed (Sherard 1987), the importance of design provisions to minimize seepage, particularly in karstic geology, has now become a standard engineering practice. The Wolf Creek Dam, the largest artificial reservoir east of the Mississippi River, has periodically undergone grouting of seepage holes throughout its existence (Boynton and Hossain 2010). With increased fluctuation of flows downstream of dams, it did not take long for the concept of environmental flow (Tharme 2003) and indicators of hydrologic alteration (IHA) (Richter et al. 1996) to be devised for better ecosystem-centric dam operations in impounded basins. When more residential and commercial development is planned in an impounded river basin, it is intuitive to the engineer that the increase in imperviousness of the land surface may require larger detention basins at select locations to account for the increased runoff and erosion from excess rainfall. The climatic impacts (i.e., feedbacks) of dams, however, are unique areas that have received little consideration by the engineering profession for dam building and operations. Climate, by virtue of its definition, represents anything but a hands-on phenomenon. Unlike weather, climate impacts are not measured instantaneously. Given the current breadth of engineering curricula that exclude atmospheric and climate-science subjects as prerequisites at the freshmen and sophomore levels, a large artificial lake having an
最长约 10秒,即可获得该文献文件

科研通智能强力驱动
Strongly Powered by AbleSci AI
更新
PDF的下载单位、IP信息已删除 (2025-6-4)

科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
camellia发布了新的文献求助10
刚刚
1秒前
Owen应助小羊采纳,获得10
1秒前
量子星尘发布了新的文献求助10
1秒前
1秒前
2秒前
四月77发布了新的文献求助10
2秒前
清爽的乐曲完成签到,获得积分10
3秒前
jjn完成签到 ,获得积分10
3秒前
小菜发布了新的文献求助10
3秒前
科研通AI6应助wlm采纳,获得10
4秒前
5秒前
小雯钱来完成签到,获得积分10
5秒前
啵啵阳子完成签到,获得积分10
5秒前
刻苦的白梅完成签到,获得积分20
5秒前
Sun_Chen发布了新的文献求助10
5秒前
小福发布了新的文献求助10
6秒前
6秒前
6秒前
7秒前
7秒前
camellia完成签到,获得积分10
7秒前
小兰花完成签到,获得积分10
7秒前
晴清完成签到 ,获得积分10
9秒前
Owen应助XU2025采纳,获得10
9秒前
10秒前
LMW应助安详晓亦采纳,获得10
10秒前
10秒前
11秒前
寻觅发布了新的文献求助10
11秒前
烟花应助开朗尔蓝采纳,获得10
12秒前
leaolf应助杨建明采纳,获得30
12秒前
13秒前
Jia发布了新的文献求助10
13秒前
wanci应助24采纳,获得10
13秒前
谢子璇发布了新的文献求助10
13秒前
Banana完成签到,获得积分10
14秒前
14秒前
15秒前
VDC应助王星星采纳,获得30
15秒前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
计划经济时代的工厂管理与工人状况(1949-1966)——以郑州市国营工厂为例 500
INQUIRY-BASED PEDAGOGY TO SUPPORT STEM LEARNING AND 21ST CENTURY SKILLS: PREPARING NEW TEACHERS TO IMPLEMENT PROJECT AND PROBLEM-BASED LEARNING 500
The Pedagogical Leadership in the Early Years (PLEY) Quality Rating Scale 410
Modern Britain, 1750 to the Present (第2版) 300
Writing to the Rhythm of Labor Cultural Politics of the Chinese Revolution, 1942–1976 300
Lightning Wires: The Telegraph and China's Technological Modernization, 1860-1890 250
热门求助领域 (近24小时)
化学 材料科学 医学 生物 工程类 有机化学 生物化学 物理 纳米技术 计算机科学 内科学 化学工程 复合材料 物理化学 基因 催化作用 遗传学 冶金 电极 光电子学
热门帖子
关注 科研通微信公众号,转发送积分 4602181
求助须知:如何正确求助?哪些是违规求助? 4011609
关于积分的说明 12419641
捐赠科研通 3691701
什么是DOI,文献DOI怎么找? 2035278
邀请新用户注册赠送积分活动 1068494
科研通“疑难数据库(出版商)”最低求助积分说明 953025