脱盐
选矿
洁净煤
碳化作用
煤
废物管理
浸出(土壤学)
中试装置
制浆造纸工业
石灰
环境科学
化学
工程类
材料科学
化学工程
冶金
搪瓷漆
复合材料
土壤水分
土壤科学
作者
Santosh Kumar Sriramoju,Pratik Swarup Dash,A. Suresh,Tathagata Ray
标识
DOI:10.1016/j.jclepro.2021.129497
摘要
Indian coal washing plants face tremendous pressure in maintaining clean coal yield and handling the rejects. Conventional coal washing plants generate clean coal with 15–18% ash content and 35–50% yield by several physical beneficiation techniques. Handling and disposal of the rest of 50% reject is an environmental concern and hence, alternate processes for utilization of high-ash washery rejects are of high importance. In this work, the chemical demineralization process is explored at a pilot scale to produce the low ash clean coal from different washery rejects. 44.6%–67.8% demineralization is achieved with the single-stage alkali-acid leaching process and 68.4%–78.3% by multi-stage leaching at optimum operating conditions. However, the economics of the process depends on the regeneration of the spent alkali solution. Therefore, a two-step methodology for spent-alkali regeneration is developed. In the first step, carbonation of spent-alkali with CO2 separates almost >95% of the silica and alumina impurities. In the second step, 89.2% caustic soda is recovered by causticization using quick lime.
科研通智能强力驱动
Strongly Powered by AbleSci AI