The Research of Shipbuilding Schedule Planning and Simulation Optimization Technique Based on Constant Work-In-Process System

造船 地铁列车时刻表 平面图(考古学) 生产计划 过程(计算) 制造工程 工程类 生产进度表 计算机科学 系统工程 调度(生产过程) 运筹学 工业工程 生产(经济) 运营管理 操作系统 历史 宏观经济学 经济 考古
作者
Yue Wang,Rui Ma,Lin Yan
出处
期刊:Journal of ship production and design [The Society of Naval Architects and Marine Engineers]
卷期号:34 (01): 20-31 被引量:3
标识
DOI:10.5957/jspd.160025
摘要

This paper proposes a shipbuilding schedule planning system based on the constant work-in-process (CONWIP) as a new way to deepen the schedule planning management and implement the lean shipbuilding. It fully discusses the forms, key elements, the ways and processes of implementation, etc. It demonstrates the advantages of the CONWIP system over the KANBAN system and the feasibility of applying the CONWIP system in shipbuilding by taking the flat section manufacturing of the shipbuilding as an example and applying the plant-simulation software to simulation analysis. We also provide the corresponding solutions to solve the problems, found in the application of the CONWIP system, and discuss the process and result of a simulation of the solutions. 1. Background The level and the structure of the shipbuilding production plan are relatively complex, and the derivative of the plan has many kinds of the species. After many years of researches and practices of shipbuilding enterprises in domestic and foreign, the types and classifications of the shipbuilding production plan have become consistent, which means that the shipbuilding production plan is composed of the three types of plans: basic plan, load plan, schedule plan. Basic plan is a programmatic plan in system, load plan is a system of protection plan, and schedule plan is implementation plan. Shipbuilding production planning system is shown in Table 1. Schedule plan usually decomposes the plan into each workstation and process, and then comes into the schedule plan of workstations and processes according to the general production task, the basic plan and building procedure. The plan mainly contains large schedule plan, medium schedule plan, and detailed schedule plan. Large schedule plan mainly refers to the construction of the main process planning, main material demand date, and comprehensive plan of each professional drawing; the medium schedule plan includes preinstallment medium schedule plan, the succeeding medium schedule plan, and installment medium schedule plan, which are based on the erection network scheduling; detailed schedule plan mainly refers to the monthly, weekly, and daily production plan which are made on the standard of the medium schedule plan by the production department. The traditional shipbuilding planning is top-down push plan system. In this system, it requires a complete production management data for production department from the design and planning departments. Load plan and schedule plan are strictly made and carried out on the basis of production load balance which conducted by working hours, capacity, and the data of energy consumption. However, because of the planning system in which monthly plan is made to meet the line table as a starting point, so it lacks of the balance of the actual state. Eventually, this plan system leads to a poor balance and operability, random plan execution, and a great deviation in the actual production situation of the system, because of these the scheduling production relies heavily on spot control. Therefore, during the current time when the lean shipbuilding idea is a consensus of the industry development, how to enhance the schedule planning management has become a key issue for the realization of the lean shipbuilding.

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
5秒前
超级发布了新的文献求助10
9秒前
9秒前
Marshall完成签到,获得积分10
14秒前
Nes发布了新的文献求助10
15秒前
烟花应助伯克利芙蓉王采纳,获得10
16秒前
woaikeyan完成签到 ,获得积分10
16秒前
connie完成签到,获得积分10
17秒前
19秒前
22秒前
wodemaya完成签到,获得积分10
23秒前
完美世界应助connie采纳,获得10
23秒前
环境恢复发布了新的文献求助30
24秒前
26秒前
27秒前
29秒前
李雩完成签到,获得积分10
31秒前
LYP完成签到,获得积分10
31秒前
34秒前
过时的鼠标完成签到 ,获得积分10
35秒前
呆萌的斓发布了新的文献求助10
35秒前
38秒前
摘一朵棉花完成签到,获得积分10
38秒前
LM完成签到,获得积分10
38秒前
星辰大海应助难过的饼干采纳,获得10
38秒前
yutang完成签到 ,获得积分10
42秒前
杨科发布了新的文献求助10
42秒前
健忘的自行车完成签到,获得积分10
44秒前
fff完成签到 ,获得积分10
46秒前
46秒前
甜甜的大香瓜完成签到 ,获得积分10
50秒前
Allen发布了新的文献求助10
50秒前
50秒前
老地方完成签到,获得积分10
52秒前
SheltonYang发布了新的文献求助10
52秒前
Mimi发布了新的文献求助10
55秒前
ccc完成签到 ,获得积分10
57秒前
58秒前
夜安完成签到,获得积分20
1分钟前
科目三应助Mimi采纳,获得10
1分钟前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
Handbook of pharmaceutical excipients, Ninth edition 5000
Aerospace Standards Index - 2026 ASIN2026 3000
Digital Twins of Advanced Materials Processing 2000
Polymorphism and polytypism in crystals 1000
Signals, Systems, and Signal Processing 610
Discrete-Time Signals and Systems 610
热门求助领域 (近24小时)
化学 材料科学 医学 生物 工程类 纳米技术 有机化学 物理 生物化学 化学工程 计算机科学 复合材料 内科学 催化作用 光电子学 物理化学 电极 冶金 遗传学 细胞生物学
热门帖子
关注 科研通微信公众号,转发送积分 6042126
求助须知:如何正确求助?哪些是违规求助? 7787909
关于积分的说明 16236578
捐赠科研通 5188013
什么是DOI,文献DOI怎么找? 2776165
邀请新用户注册赠送积分活动 1759288
关于科研通互助平台的介绍 1642725