Risk evaluation of mega infrastructure construction supply chain in engineering-procurement-construction projects: an integrated fuzzy AHP and fuzzy DEMATEL approach

采购 模糊逻辑 供应链 层次分析法 百万- 业务 风险分析(工程) 计算机科学 工程类 系统工程 运筹学 人工智能 天文 物理 营销
作者
Runze Yu,Li Ma
出处
期刊:Engineering, Construction and Architectural Management [Emerald Publishing Limited]
卷期号:32 (5): 3217-3235 被引量:16
标识
DOI:10.1108/ecam-05-2023-0472
摘要

Purpose The paper covers mega infrastructure construction supply chain (MICSC) in Engineering-Procurement-Construction (EPC) projects, where the frequent occurrence of risk incidents has greatly affected human life. The research aims to establish a risk evaluation index system for MICSC in EPC projects, exploring what risk factors lead to risk incidents and measure the importance and causality of all these risk factors. Design/methodology/approach The research applies a combination of quantitative and qualitative analysis methodology to process data sequentially. In the first place, risk factors for MICSC in EPC projects are extracted and identified from literature survey and expert interviews. In the second place, an integration model fuzzy Analytic Hierarchy Process (f-AHP) and fuzzy Decision-making Trial and Evaluation Laboratory (f-DEMATEL) is constructed to comprehensively analyze all these risk factors. Findings 12 primary risk factors and 36 secondary risk factors comprise the risk evaluation index system for MICSC in EPC projects from 178 literature and 5 professionals. The results indicate that Political Situation (F1), Social Security (F2) and Management Mode (F8) are critical risk factors, where F1 and F2 are cause factors and F8 is an effect factor. Originality/value There are three main contributions of this paper. First and foremost, from the perspective of the research content, no other study has been able to assess risk factors for MICSC in EPC projects, while embedding nine phases of the whole project life cycle and six subjects of stakeholders into a risk evaluation index system. Additionally, from the perspective of research method, a combined model incorporating f-AHP and f-DEMATEL is constructed to avoid the one-sidedness of a single model. Last but not least, from the perspective of practical significance, focusing on the critical risk factors, a series of effective measures are formulated to make appropriate management decisions for nodal enterprises of MICSC, which can improve their risk management capabilities.
最长约 10秒,即可获得该文献文件

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
Unifrog完成签到,获得积分10
2秒前
4秒前
务实书包完成签到,获得积分10
4秒前
XIAOMEI完成签到,获得积分20
4秒前
clover完成签到,获得积分10
6秒前
7秒前
dd完成签到 ,获得积分10
11秒前
xuexi发布了新的文献求助10
12秒前
15秒前
fffccclll发布了新的文献求助10
18秒前
共享精神应助VEMCMG采纳,获得10
26秒前
慕青应助XIAOMEI采纳,获得10
31秒前
zzn发布了新的文献求助10
31秒前
32秒前
小宋完成签到,获得积分10
33秒前
大鼻子的新四岁完成签到,获得积分10
34秒前
zc发布了新的文献求助10
37秒前
43秒前
灵巧冰露完成签到,获得积分10
45秒前
ding应助zc采纳,获得10
46秒前
zachary009完成签到 ,获得积分10
48秒前
灵巧冰露发布了新的文献求助10
48秒前
思源应助zzn采纳,获得100
49秒前
57秒前
一点完成签到,获得积分10
59秒前
魏立翔完成签到,获得积分10
1分钟前
1分钟前
1分钟前
1分钟前
1分钟前
1分钟前
识字岭的岭应助susu采纳,获得20
1分钟前
bless完成签到 ,获得积分10
1分钟前
毓秀完成签到,获得积分10
1分钟前
幽默的战斗机完成签到,获得积分10
1分钟前
1分钟前
小马哥爱学习完成签到,获得积分10
1分钟前
1分钟前
VEMCMG发布了新的文献求助10
1分钟前
1分钟前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
Polymorphism and polytypism in crystals 1000
Relation between chemical structure and local anesthetic action: tertiary alkylamine derivatives of diphenylhydantoin 1000
Signals, Systems, and Signal Processing 610
Discrete-Time Signals and Systems 610
Death Without End: Korea and the Thanatographics of War 500
Der Gleislage auf der Spur 500
热门求助领域 (近24小时)
化学 材料科学 医学 生物 工程类 纳米技术 有机化学 物理 生物化学 化学工程 计算机科学 复合材料 内科学 催化作用 光电子学 物理化学 电极 冶金 遗传学 细胞生物学
热门帖子
关注 科研通微信公众号,转发送积分 6079994
求助须知:如何正确求助?哪些是违规求助? 7910600
关于积分的说明 16360973
捐赠科研通 5216431
什么是DOI,文献DOI怎么找? 2789127
邀请新用户注册赠送积分活动 1772046
关于科研通互助平台的介绍 1648816