回溯
计算机科学
工作(物理)
生产计划
路径(计算)
流离失所(心理学)
生产线
直线(几何图形)
工程制图
生产(经济)
工业工程
数学
工程类
算法
机械工程
心理学
几何学
经济
心理治疗师
宏观经济学
程序设计语言
作者
Buchari,U Tarigan,Majestira Ambarita
出处
期刊:IOP conference series
[IOP Publishing]
日期:2018-02-01
卷期号:309: 012116-012116
被引量:16
标识
DOI:10.1088/1757-899x/309/1/012116
摘要
PT. XYZ is a wood processing company which produce semi-finished wood with production system is make to order. In the production process, it can be seen that the production line is not balanced. The imbalance of the production line is caused by the difference in cycle time between work stations. In addition, there are other issues, namely the existence of material flow pattern is irregular so it resulted in the backtracking and displacement distance away. This study aimed to obtain the allocation of work elements to specific work stations and propose an improvement of the production layout based on the result of improvements in the line balancing. The method used in the balancing is Ranked Positional Weight (RPW) or also known as Helgeson Birnie method. While the methods used in the improvement of the layout is the method of Systematic Layout Planning (SLP). By using Ranked Positional Weight (RPW) obtained increase in line efficiency becomes 84,86% and decreased balance delay becomes 15,14%. Repairing the layout using the method of Systematic Layout Planning (SLP) also give good results with a reduction in path length becomes 133,82 meters from 213,09 meters previously or a decrease of 37.2%.
科研通智能强力驱动
Strongly Powered by AbleSci AI