地震振动台
脆弱性
摇动
结构工程
持续时间(音乐)
增量动力分析
塔楼
输电塔
地震分析
工程类
声学
物理
机械工程
热力学
作者
Li Tian,Meng Yang,Juncai Liu,Zhen Ma,Jinlin Gong,Haomiao Chen,Xuyi Luo
标识
DOI:10.1016/j.tws.2024.111584
摘要
Although extensive attention has been devoted to the influence of ground motion duration on the seismic performance of various structures, the integration of the duration effect into the seismic analysis of transmission tower-line systems (TTLSs) has been rarely studied, leading to a lack of understanding regarding the relationship between the ground motion duration and the seismic response of TTLSs. This paper aims to quantify the duration effect on the structural performance and seismic fragility of a TTLS through shake table tests and numerical simulations. To achieve this goal, a reduced-scale experimental model of a TTLS is carefully designed and fabricated, and a group of ground motions with contrasting durations is chosen using a spectral matching method. Subsequently, shake table tests are conducted to examine the duration effect on the seismic responses of the TTLS. The recorded data indicates that long-duration ground motions (LDGMs) significantly amplify the seismic responses and have the potential to degrade the structural performance. Furthermore, a validated finite element model of the TTLS is employed to compute its nonlinear responses from elastic behavior to complete plasticity utilizing incremental dynamic analysis. Probabilistic assessments are also conducted to investigate the seismic fragility and loss of the TTLS. The findings reveal higher damage probabilities and more severe losses caused by LDGMs, emphasizing the importance of considering the duration effect in the seismic performance assessment of TTLSs. This investigation contributes to a meaningful exploration for reliably assessing the seismic capacity of TTLSs while accounting for the duration effects.
科研通智能强力驱动
Strongly Powered by AbleSci AI