稳健性(进化)
数学优化
端口(电路理论)
计算机科学
整数规划
灵敏度(控制系统)
列生成
稳健优化
约束(计算机辅助设计)
运筹学
工程类
数学
机械工程
生物化学
化学
电子工程
电气工程
基因
作者
Xufeng Tang,Xinqi Li,Ming Yin
标识
DOI:10.1016/j.cie.2024.110038
摘要
This study constructs a mixed integer programming model for the integrated quay crane allocation problem to minimize vessels' waiting time and delay time cost. Taking the uncertainty of quay crane operation efficiency into consideration, this study constructs a stochastic programming model and a distributional robust chance constraint (DRCC) model. In addition, column generation is applied to solve the three proposed models. Moreover, this paper uses real-world data from Shanghai Yangshan Port to verify the effectiveness of proposed model and algorithm. To prove the robustness of the DRCC model, this study conducts an uncertain parameters sensitivity analysis, and analyzes the performance of the models proposed above. The results show that the proposed DRCC model has better anti-interference ability. The conclusion drawn from this study has potential implications for resource allocation within port operations.
科研通智能强力驱动
Strongly Powered by AbleSci AI